Project Overview
Submarine canyons move sediment from the coast to the deep sea in sudden turbidity currents: fast, dense underwater flows that can scour the seafloor and damage cables and instruments. During MBARI's Coordinated Canyon Experiment, one such flow ran down Monterey Canyon on 15 January 2016, between two seafloor surveys.
The question: where did the canyon floor change, by how much, and which of those changes are real rather than differences between surveys? Answering the second half mattered as much as the first.
My Role
- Read and verified the raw netCDF grids, then converted them to georeferenced GeoTIFFs
- Built terrain products: hillshade, slope and contours
- Designed the change detection with slope-dependent detection limits
- Found three survey artifacts and a 4.6 cm vertical offset between surveys
- Reported results two ways, raw and corrected, with volume uncertainty
- Produced all maps, the QGIS project and the technical report
Independent analysis of a public MBARI dataset. I did not collect the data; I worked from MBARI's processed grids, not raw sonar soundings.
Data & Tools
Data
- MBARI mapping AUV, Reson 7125 multibeam (0.15 m vertical precision)
- Three 1 m grids: 4 Nov 2015, 1 Dec 2015, 28 Jan 2016
- 8,414 × 2,703 cells per grid, WGS 84 / UTM 10N
- MBARI's published difference grids, used as a check
Software
- Python (NumPy) for every computed product
- GDAL
- QGIS for inspection, styling and layout
Methodology
- Verify the gridsConfirm all three share one 1 m lattice; record CRS, NoData and sign convention
- Build terrainGeoTIFF conversion, hillshade, slope and contours
- DifferenceLater minus earlier depth for a quiet month and for the flow period
- Set detection limitsNoise from the quiet month, per slope class: 0.27 m on gentle ground to 0.72 m on walls
- Screen artifacts100 m block offsets reveal survey errors; three zones masked
- Test sensitivityRemove the inter-survey offset; report raw and corrected volumes side by side
Results & Deliverables
Compare: Canyon Shape vs Measured Change
Drag across the map. Left of the line is the canyon's shaded-relief bathymetry before the flow; right of it is the change measured across the January 2016 event, shown only where it beats the detection limit. The erosion follows the deepest line of the canyon floor almost the whole way.
- Erosion
- Deposition
- No detectable change
Erosion
−809k m³
± 132k · about 6σ
Deposition
+470k m³
± 93k · about 5σ
Floor changed
38%
vs 15% in a quiet month
Net balance
Unresolved
depends on a 4.6 cm offset
Shaded-Relief Bathymetry
The canyon before the flow: a winding floor dropping from about 190 m to 510 m deep across the reach, scarp-lined walls, and trains of crescent-shaped bedforms along the axis.
Seafloor Change Across the January 2016 Flow
Corrected elevation difference, 28 Jan − 1 Dec, beyond the 95% detection limit. Red is erosion, blue deposition. The western half holds 63% of the erosion volume and three times as many cells eroded by more than 2 m as the eastern half.
Background vs Event
The same analysis for a quiet 27-day interval and the 58-day interval containing the flow. In the quiet month, thin alternating stripes show bedforms creeping downslope; after the flow, solid scour runs along the thalweg and the changed area doubles from 10% to 22%.
Quality Control: Separating Survey Error from Seafloor Change
Median change in 100 m blocks. Real canyon change follows the floor; whole blocks shifted at coverage edges or along a survey line point to acquisition problems. Three such zones were masked, and stable ground showed the January survey sitting 4.6 cm higher than December's.
| Flow period | As published | Corrected | Holds? |
|---|---|---|---|
| Erosion | −783k ± 129k m³ | −809k ± 132k m³ | Yes |
| Deposition | +606k ± 130k m³ | +470k ± 93k m³ | Yes |
| Net | −177k ± 183k (1.0σ) | −339k ± 162k (2.1σ) | No |
Reproducibility check: my event difference grid matches MBARI's published one cell for cell. Their reference-period grid does not match their own published bathymetry (30% of cells differ, one by 137 m), so it was built from a different processing version. The noise level is identical either way, so conclusions don't change.
Technical Limitations
This works from MBARI's processed grids, not raw soundings, so errors inside the sonar processing cannot be corrected at source. The quiet-month noise reference contains real bedform migration, which makes the detection limits conservative. Changes under about 0.7 m on steep walls are below detection. The event comparison spans 58 days, so linking all change to the 15 January flow rests on its timing and pattern. The net sediment budget is not resolved because it depends on inter-survey vertical control.
Commercial Applications
Subsea infrastructure
Repeat-survey comparison along cable and pipeline routes to flag scour, burial and slope failure.
Ports & dredging
Before-and-after volumes for dredging and channel maintenance, with stated detection limits.
Survey QA
Independent checks of survey alignment, vertical offsets and artifacts before results are reported.
Need repeat-survey change analysis for your project?
Request a QuoteData credit: Paull, C. and Caress, D. (2019), High-resolution (1 m) bathymetric data from Monterey Canyon, offshore California, Marine Geoscience Data System, doi:10.1594/IEDA/324756. MBARI Coordinated Canyon Experiment. Licensed CC BY-NC-SA 3.0; figures on this page are derived works shared under the same licence.